• Sabre Springs Corporate Center

    1/8

  • Sabre Springs Corporate Center

    2/8

  • Sabre Springs Corporate Center

    3/8

  • Sabre Springs Corporate Center

    4/8

  • Sabre Springs Corporate Center

    5/8

  • Sabre Springs Corporate Center

    6/8

  • Sabre Springs Corporate Center

    7/8

  • Sabre Springs Corporate Center

    8/8

Sabre Springs Corporate Center

SABRE SPRINGS CORPORATE CENTER – RESTORATION
San Diego, California
Client
Kilroy Realty
Completion
Professional Services: 2008
Project Cost
$750,000
Project Size
120,000 sf
Services
Masterplanning, Full Architectural, Space Planning, Interior Design, Site Design,
Landscape, Structural Design, Mechanical, Electrical and Plumbing Engineering

Project Info.
The office park consists of two concrete R&D/ office buildings on approximately 5 acres. PCA designed the building restoration project with an eye towards market place demands, using current materials to enhance the overall arrival and entry into the spaces. The exterior skin was rejuvenated with defined entry points, new glazing, canopies and drought tolerant / native landscaping. This reduced site water consumption by 25%. LEED inspired design elements such as efficient HVAC, enhanced exterior glazing, permeable walk surfaces all bring added value to the project. PCA also redesigned the parking layout to add 5% more parking stalls.